| The day we started framing the interior of the Zach Shack. |
| Estimated reading time: 1 minute(s) (227 words) |
The containers come with one set of double doors on one end. The first step, done before I arrived, was to install a "normal"
door at the other end, along with a window on each side. Otherwise the interior is raw, uninsulated, corrugated steel.
Zach moved his stuff (he's been living here during construction) to one end, in accordance with his plan to basically do one end of
the container at a time.
Keith and I both helped Zach, but as I was also documenting there's no proof I had anything to do with it.
Many days' work remains to be done on this project. But I know it's gonna look great when he gets it done!